Capital and IC

Shareable reference

Write the IC memo the committee can still test after close

A Venture Architect rebuilds the IC paper from live behavior so a cold reader can poke the thesis at month six, not only at signing.

A practical example

What this looks like in the business

Oakridge Partners is in exclusivity on a $42M ARR claims platform. The CIM lists five production modules and a 22% EBITDA path from automation already live. IC sits in 18 days. The desk traces live tenants: three modules exist only on the demo tenant, and 18% of volume still hits a 40-person overflow desk the CIM called temporary. The memo is proceed only at a lower entry multiple with a holdback on overflow, or walk.

What you leave with. An IC paper with thesis, price, structure, accepted risks, and post-close KPIs that can be reopened without rebuilding the case from a shared drive.

Not this. An overnight CIM-to-memo draft or a slide factory recut of the teaser. Calendar for this class of work is measured in weeks, not hours.

Find a Venture ArchitectAll use cases