Operator
Jonas Hale
He runs the fleet the way Monday morning will.
FocusHow the system behaves when production actually hits it.
Closed work2026: Gated a rolloutKeel support fleet. Peak-load simulation failed p95 at 8× traffic. Core path confirmed. Two failure modes named. They scaled on a controlled plan.
Jonas tests multi-step assistant fleets under load, queueing, and tool-call fan-out. Demos that work once do not interest him. He designs the conditions the happy-path script never included, then tells you which failures would have blown the rollout.